Estimate | Std. error | t-value | p-value | ||
---|---|---|---|---|---|
(Intercept) | − 24.5 | 12.2 | − 2.0 | 0.045 | |
Date | 0.002 | 0.001 | 3.7 | 0.000 | |
UC | − 111.9 | 18.6 | − 6.0 | 0.000 | |
UCPT | 44.4 | 16.6 | 2.7 | 0.009 | |
Date × UC | 0.007 | 0.001 | 6.4 | 0.000 | |
Date × UCPT | − 0.007 | 0.001 | − 2.7 | 0.007 | |
AIC | 5022.2 | ||||
BIC | 5057.7 | ||||
logLik | − 2503.1 | ||||
(Intr) | Date | UC | UCPT | Date x UC | |
Date | − 1.0 | ||||
UC | 0.2 | − 0.2 | |||
UCPT | − 0.1 | 0.1 | − 0.6 | ||
Date × UC | − 0.2 | 0.2 | − 1.0 | 0.6 | |
Date × UCPT | 0.1 | −0.1 | 0.6 | − 1.0 | − 0.6 |